Wyoming Medical Center – Hybrid OR

This project included renovating the existing food service areas on the first floor into space for a Philips Azurion 7 BiPlane 20/15 Vascular System. It also included pre/post procedure and support for the Hybrid Operating room and CT room. Some remodeling was done in the waiting and staff areas along with th Radiology department. We removed and replaced the existing roof with a new higher roof structure to accommodate the new equipment.

Scroll to Top