University of Wyoming – Bus Maintenance Facility

The University of Wyoming needed a facility with adequate, functional space for maintenance equipment and storage to provide better services to the university’s robust bus fleet. The Bus Maintenance Facility project included a 6,380-square-foot maintenance facility and an approximately 11,200-square-foot enclosed bus storage facility. The facility is a pre-engineered metal building. During construction, we maintained the flow of pedestrian and vehicular traffic without disruption.

Scroll to Top