University of Wyoming – Indoor Practice Facility

The Indoor Practice Facility was a design build project that required all
team members to work together to ensure that the facility was built to
the standards and guidelines set forth by the University of Wyoming.
The PEMB project involved Competitive Design Build of the project
including; State of the art synthetic turf system; Energy saving
inspire wall which helps heat the building in the winter and help cool
it in the summer; Incorporates day lighting features throughout and
Construction is adjacent to the UW War Memorial stadium

Scroll to Top